Jump to content

Recommended Posts

Posted

About 15 years ago I ran out of space in the five (5) bookcases I was using for CD/DVD storage.  I figured there had to be a better way, and after a bit of thinking, I came up with it.  On-wall, only 6” deep, adjustable shelf height, and inexpensive and easy to build.  
 

With the expansion of my library into 4k discs, I am adding a 60”x42” chunk of the shelving In my current media room (6’ X 8’ walk in closet).  I thought I’d document the construction process here, for anyone that may wish for a similar storage solution.

 

The system itself consists of 1”x2” mounting rails (x2), and  6” strips of 3/4” oak plywood with screen molding to cover the edge for the vertical supports and the individual shelves.  I’ve included a few photos below from my original build, but I’ll do a thorough step-by-step with the current build.

 

IMG_0672.thumb.jpeg.e05c19f3ac4f8d16a2a3c0dad730c1de.jpeg
 

IMG_0676.thumb.jpeg.f79373bd9e79a5094ff805aadd707d03.jpeg

 

IMG_0691.thumb.jpeg.ac272c21d824905a67d0903879dd69d4.jpeg

  • Thank You 9
  • That Rocks 1
Posted

Step one is to source a sheet of 3/4” oak plywood (or whatever wood you prefer), screen molding and 1”x2”.  I must say, I was shocked at the increase in oak plywood pricing - last time I bought it I remember paying around $40 a sheet.  No so any more - try $96 a sheet!

 

Anyway, accounting for the 1/4” thickness of the screen molding on the edge, rip the plywood into 5.75” strips to achieve the 6” overall depth.

 

IMG_4458.thumb.jpeg.ccff301bc9317f08e3d5d5b9a8b65220.jpeg
 

Next, cut 2 (or more) of the strips to the overall height you desire for your shelving unit - in my case, for this unit I’m going with 60” (Al the other shelving in my room is 96”, or the full 8’).  These will be the vertical or side supports.  In order to make the shelving fully adjustable, these need to have a series of holes drilled for the shelf support pegs.  These hole need to be perfectly spaced, drilled perfectly perpendicular, and be  a perfect consistent depth on BOTH boards.  Luckily, Kreg makes a jig for this that is quite affordable and easy to use…

 

IMG_4460.thumb.jpeg.1ef8a73919fcf54bfb8b9207835640d4.jpegIMG_4459.thumb.jpeg.0d30876e993d09d17cca34172c8634a6.jpeg

  • Thank You 6
Posted (edited)

Work these two strips together and symmetrically, so that your shelves will be level.  I mark the top of each, and start my holes at the exact same height.  The bit included with the jig has an adjustable stop collar - set it to the correct depth and drill the starter hole at the top.  Then position the jig with the included pin and drip the remaining holes.  Move the jig down, place the pin and repeat.  It’s not near as monotonous as it sounds, and it goes pretty fast.

 

IMG_4462.thumb.jpeg.8e7d02e471d57b7fe3862b5c45fbe810.jpeg
 

IMG_4463.thumb.jpeg.1b5e6840dcfa9f674dddca872a112ee3.jpeg

 

IMG_4464.thumb.jpeg.28d26091b2f5b42388b0392154aad93e.jpeg

 

IMG_4465.thumb.jpeg.c327d1d0fefd39f2a83a6255e9963ead.jpeg
 

IMG_4466.thumb.jpeg.61b39012b8beed024280684d5d34f88f.jpeg

Edited by Daddyjt
  • Thank You 5
Posted (edited)

Next is cutting the individual shelves.  In my case, I want 42” overall width, so subtracting the 3/4” (x2) for the side panels gives me 40.5”.  Cut and build a couple more shelves than you think you’ll need!  You already have everything out - just make a couple extras, as you never know what your future needs will be.  You’ll thank me later.  Also cut your 1”x2” to the overall width (42” for this one) and all the screen molding for the exposed edges.

 

IMG_4467.thumb.jpeg.4d34f8094a6c766518583d4d33d953b7.jpeg
 

IMG_4468.thumb.jpeg.5da7c20fa9c50390438b136152d9affa.jpeg

 

There are a couple different ways to mount the screen molding to the edges.  Glue and clamp, clue and finish nail (with nail-set and wood putty), or glue and pin nail with an air nailer - this is the method I use.

 

IMG_4469.thumb.jpeg.5923eadc7802c2913ab8dea80b20fac1.jpeg
 

IMG_4470.thumb.jpeg.a2a1ffd45ae45bf0e290da047979f884.jpeg

Edited by Daddyjt
  • Thank You 8
  • That Rocks 1
Posted

Darn nice job!  Thanks for sharing.  Liked the tip about cutting more shelves; voice of experience there.

  • Thank You 1
Posted

Very nice - I like keeping stuff off the floor and shelving like this is a perfect way to do it.

  • Thank You 1
Posted

Next is perhaps the most precise part of construction - the cutting of the 1”x2” notches in the vertical supports. It is critical that they be cut in the exact same place on all verticals supports being made for a continuous run, or it will be impossible to have level shelves.  For these reasons, I stack the vertical supports and cut them at the same time.

 

IMG_4471.thumb.jpeg.702888bf4f42d7a35ee5aa4b492a6db8.jpeg
 

IMG_4472.thumb.jpeg.184619283e0173d8e62a5ea80c52cd83.jpeg

 

IMG_4473.thumb.jpeg.48f198cee46a907d6489da65d2c534c2.jpeg

 

Next up is sanding.  DO NOT skimp on sanding!  It takes a bit of time, but few things can make or break a project quite like sanding (or lack thereof).  I do a full pass with 120 on the random orbital, then a pass with the 1/3 sheet at 180, then a final pass with 220 on the 1/3 sheet.  I like the random orbital on initial passes, but not for the final.

 

IMG_4475.thumb.jpeg.81031408bcc1017e9211263e4b200c42.jpeg

 

IMG_4476.thumb.jpeg.469469a797579d9a943c2c1bee9a647d.jpeg

  • Thank You 3
  • That Rocks 3
  • Love this! 1
  • Community Admin
Posted

Super nice, Mark.

 

I'm a big proponent of hanging shelves on the wall - and not on the floor.

 

I hate the damage to the carpet, floor standing furniture always does..., and call me crazy, but being able to vacuum the floor under the shelves just makes me happy! 

  • Thank You 1
  • That Rocks 1
  • Love this! 1
Posted

With sanding done, SWEEP UP YOUR WORK AREA!  This will minimize kicking up dust and particles during the finishing process. I like to hit all surfaces with the air compressor to blow off as much dust as possible.  This also gets dust out of the grain, which will really make the grain stand out when stained/finished. After the compressor treatment, a tac cloth is a good idea, right before finishing. 
 

For this project, I’m not using a stain, just a satin polyurethane finish. For a project like this, I just use a foam brush and toss it when done. Long strokes with the grain, and careful to avoid drips/sags…

 

IMG_4478.thumb.jpeg.bc13e3b356bc6d1463851279d43f499b.jpeg

 

IMG_4479.thumb.jpeg.1debdb3667b0686cb555271f3c7c19f6.jpeg

 

24 hours (depending on temp/humidity - but if ANY tac remains, WAIT!) later, a good rubbing with semi-coarse steel wool is essential to smooth the wood down. DO NOT use steel wool if using a water-based finish!!  After steel wool, tac cloth again and another coat of polyurethane.

 

IMG_4480.thumb.jpeg.f9d1bf7212cc563b97a625c6f5874b4e.jpeg

 

IMG_4481.thumb.jpeg.a595ba5d9954345397bd4b5a6f501d9d.jpeg

 

IMG_2966.thumb.jpeg.ecf782d9ad0aa6ec10d61f0a6a14e819.jpeg

  • Thank You 8
Posted

Well done!

  • Thank You 1
Posted

After the second coat of polyurethane has dried, a second steel wool treatment with fine (000 or 0000) and another tac cloth rub.

 

IMG_4482.thumb.jpeg.925ada86c3dcd629e494b61a0437fd95.jpeg

 

Now that all the wood cutting and finishing is done, it’s time for construction.  The key to the strength of this build lies here - the 1”x2” mounting boards are screwed into the notches in the vertical supports FROM THE BACK SIDE, before the unit is mounted to the wall, then the entire assembly (sans shelves) is mounted to the wall.

 

IMG_4483.thumb.jpeg.dbad34a72a9b185dfecd925be074015e.jpeg

 

IMG_4484.thumb.jpeg.b98d8cce023e2f5dad0b3857ba7dfd90.jpeg

 

IMG_4488.thumb.jpeg.3e54a6867c58ca9da0d785510d712be7.jpeg

 

IMG_4490.thumb.jpeg.992e21d17e76df0e1ca41354e4b5feff.jpeg

IMG_4486.jpeg

  • Thank You 5
Posted (edited)

On the last pic (of the previous batch) you can see the nice gloss and the reflections.  Looks fantastic!

Edited by Half Life
  • Thank You 1
Posted (edited)

The completed frame is quite light, allowing it to be positioned and mounted to the wall. Take care to make sure it is both level AND square when mounting!  Once it is mounted, populate the shelves to the desired height.  One of the only potential annoyances with this system is this:  If a shelf is positioned such that the 1”x2” wall support is contacting the upper half of your media, it will allow for the bottom portion of your media to push in farther than the top, where it is contacting the 1”x2”.  In this case, simply cut a spare 1x2 to the width of your shelf and lay it at the bottom/back of the shelf, so that the media contacts a 1x2 on the top and bottom.

 

IMG_4491.thumb.jpeg.0b9b8f37d55df9f7b003c85391643459.jpeg
 

IMG_4492.thumb.jpeg.3e064204995fc59b01a2badc5fbd1b3b.jpeg

 

IMG_4493.thumb.jpeg.259532863d27952e36428974194b09c4.jpeg

 

This shelf is for my growing 4k collection (and Atmos music).  You can see below, my old 4k storage (far right of frame) was almost full.  On the new shelving, I’m only about 1/2 full.  Oh, and I already use one (1) of the two (2) extra shelves I built;-)

 

IMG_4491.thumb.jpeg.0b9b8f37d55df9f7b003c85391643459.jpeg

 

 

IMG_4495.thumb.jpeg.d9a98e37bb2c6fbe266d0df59ace1614.jpeg
 

IMG_4496.thumb.jpeg.02e9a733c7d3fac21bb046412bf13b23.jpeg

Edited by Daddyjt
  • Thank You 3
  • That Rocks 4
  • Love this! 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...